COMMERCIAL ELECTRICAL

NISI GROUP SPECIALISES IN SECTORS THAT INCLUDE; COMMERCIAL, GOVERNMENT AND HERITAGE BUILDINGS

Nisi Group recognises the often critical and complex nature of these projects. Our team of highly qualified electricians have a wealth of experience in these fields. They take a comprehensive approach and deliver high-quality results… within time and budget.

Nisi Group Service Vehicles
Neca.jpg

OUR CLIENTS

government.png
heritege building melbourne.png

COMMERCIAL

CORPORATE

GOVERNMENT

FEDERAL

HERITAGE

LISTED

STAFF EXPERIENCE

The team at Nisi Group have collectively over 30 years’ of experience in the electrical industry.  During this time, our team members have gained valuable experience working on a variety of large scale electrical installations. Their experience (Nisi Group direct and through others) includes;

HOVER TO VIEW

Heritage Buildings

Heritege Buildings
  • High voltage cabling

  • Installation of 500A main switchboard with current transformer metering 

  • Installation of sub mains (120m)

  • Design and installation of efficient  lighting (upgrade)

  • Maintenance and repairs of existing equipment while ensuring the integrity of a heritage building

  • New sub-mains installations

  • New switchboard installations

  • Worked with power distribution authority (CitiPower) on provisions for future

  • Perform safety audits on electrical installations including;

    • Thermal imaging

    • Test and tagging

    • Upgrade works to ensure electrical regulation compliance.

ELECTRICAL WORK IN
HOVER TO VIEW

Manufacturing

Manufacturing

 

  • Installed new HV conduits to supply two sub-stations and continuation to other premises

  • Designed and installed consumer mains and main switchboard with two substations to provide a 3,200 Amp factory supply (including two power factor correction units)

  • Designed, supplied and installed a complex cable support system for distribution power to multiple machines and distribution boards

  • Maximised ongoing factory performance throughout the changes

  • Ongoing maintenance and compliance checks during the 12 month warranty period

ELECTRICAL WORK IN
HOVER TO VIEW

Marine

Marine
  • Underground excavation from the main switchboard through parkland and pedestrian paths

  • Installed electrical infrastructure rated at 400 Amps per phase. (Needed four 185 mm flexible cables per phase and neutral. Cable run was ~800 metres.)

ELECTRICAL WORK IN

OUR PROCESS

PLAN

DESIGN

CONSTRUCT

DELIVER

GOT A PROJECT?

Nisi Group will deliver the best results, get in touch today.