top of page

Brighton Project

Brighton Project

Upgrade/ Retrofit

Equipment location redesign with new custom rack:

  • Brand new Pakedge network

  • Custom-built 35RU slide out equipment with a ventilation system

  • Upgraded existing Control4 automation system to the latest OS
    maintenance and upgrade on security and CCTV system

bottom of page